The GCC Standardization Organisation (GSO) has issued an announcement regarding Updated Requirements on Recognition of Test Reports for G Mark Certification.
Key points of this announcement include:
- Maximum acceptance period for test results is limited to 3 years for all Notified Body certification procedures required by GSO Technical Regulations (Toys, Low Voltage Equipment, Water Efficiency Label).
Note: For Low Voltage Equipment this constitutes a significant change, as previously no such period was defined in the scheme rules.
Effective Date: July 30, 2024
- Traceability of the test reports to the products applied for certification
- Detail requirements for acceptance of “Product Identity Declarations" (PID) or “Declarations of Identity" (DOI)